×

Projects

Location of Project

Sweetwater

When GE was awarded the O&M contract for the Sweetwater I, II and III windfarms, they called ANEMOI to perform the first round of maintenances on the 170 turbines at the farm. The ANEMOI team worked for several months to perform maintenance on the turbines as well perform some very heavy cleaning to bring the turbines back up to GE’s stringent operational standards. GE tested us, and we passed with flying colors.